The 3Cycle system is designed for efficient manufacturing and straightforward on-site assembly. This section covers best practices for both factory production and field construction.
Before manufacturing begins, ensure all documentation is complete:
Quality starts with material inspection:
Manufacturing follows standardized procedures:
Systematic inspection at each manufacturing stage:
Clear identification ensures correct assembly:
Protect components during transport:
Coordinate delivery with construction schedule:
Before assembly begins:
Follow the planned assembly order:
Proper connection execution ensures structural integrity:
Maintain dimensional accuracy:
Systematic inspection ensures quality:
Verify performance of completed systems:
Record assembly and inspection results:
Address any minor issues after assembly:
Prepare building for occupancy:
Establish long-term support:
Issue: Connections not tightening properly
Solutions:
Issue: Components not aligning properly
Solutions:
Issue: Water infiltration at component junctions
Solutions:
Proper attention to manufacturing, logistics, and assembly procedures ensures 3Cycle structures are built to the highest quality standards and perform reliably for decades.